IPD is currently constructing and installing a new complete 120 Tonne/hour superheated D-Type steam Boiler Plant (made by Cleaver Brooks Inc., USA) for Ghana’s sole oil refinery on an EPC basis.
The Project includes: design and engineering, supply, installation, testing and commissioning of the steam boiler plant and all of the auxiliary systems (deaerator systems, fuel stations, economizer and more). The Project works include, the supply and installation of a new electrical system (transformers, MV switchgear and LV distribution board), extensive civil works, and the integration of the new Boiler control system into TOR’s existing control system (DCS).
Project Status: ongoing.