The Supply and Installation of a 18.1 m³ T/Hr Air-Cooled Condenser for Tema Oil Refinery (TOR) Ltd., Ghana

IPD is currently executing a contract for the supply and installation of a state-of-the-art 18.1 Ton/hr Air-Cooled Condenser package that has the capacity to absorb all the exhaust steam condensing it back into water, which in turn is directed back into the condensate tank.
The project works include the design, manufacturing (in the UK), supply, installation and commissioning of the condenser, which will be installed on a steel structure in TOR’s Utility Area.
The project works include the mechanical, electrical and instrumentation works as well as the connection of the condenser to TOR’s new Steam Generation plant.

Project Status: awarded.